The results of the air tightness test are given with a figure in m³/hr.m² 

Good practice target is for a result anywhere between 5-7 m³/hr.m² 

The result of the test can have an impact on the installed ventilation system and must be checked that the ventilation as installed is compatible with the air permeability result.